PROJECTS

FEATURED PROJECTS

COMPANY PROFILE

PROJECT PORTFOLIO

  • Factory steel structures for the C&T3 Plant: Fabrication and installation for a development with total investment exceeding VND 258 billion in infrastructure, factory buildings, warehouses and imported machinery and equipment.
  • Working alongside South Korean specialists: Fabricated and installed hot-oil, supply and return water, compressed-air and steam piping, as well as exhaust stacks, for eight tenter machines at the C&T3 Plant.
  • Working alongside three Turkish specialists, with in-house material fabrication: Fabricated and installed hot- and cold-water supply, return, steam, air, chemical, salt and soda ash piping systems for 34 fabric dyeing machines imported from Italy at the C&T3 Plant.
  • Automatic dye dispensing equipment and salt and soda ash mixing room: Designed and installed dye dispensing piping and salt and soda ash transfer piping from the central control room to fabric dyeing machines at the C&T1, C&T2 and C&T3 Plants.
  • Supplied materials, fabricated and installed exhaust stacks for Boilers No. 1 and No. 2 at the C&T2 Plant.
  • Fabricated and installed the wastewater piping system at the C&T1 Plant.
  • Fabricated and installed three stainless steel 316L storage tanks with capacities of 20 m³, 80 m³ and 80 m³ at the Global Dyeing Plant, Long Thanh Industrial Park, Long Thanh Ward, Dong Nai City.